Nghi Son Refinery Combination.

Owner: Vietnam Oil and Gas Group. Location: Thanh Hoa Province. Total Investment: VND Billion 350.

Details about Project:

- Nghi Son Refinery Combination is built on an area of 962 hectares in Nghi Son Economic Zone, Located on the seven communes of Tinh Gia province.
- Construction period is 60 months, during which period of leveling and infrastructure construction is 22 months.
- Expected when put into operation the Nghi Son refinery combination will give a capacity of 200,000 barrels per day, about 10 million tons per year with the main products are petrol A92, A95, A98, kerosene, diesel, jet fuel... capable of providing enough oil for the domestic market.